Newconn Project by Service Type
Overhead Line Servicing
- Overhead Line Service renewals, new supplies and alterations: 2003 to 2019 (ongoing)
- Arial bundled conductor installation: 2003 to 2019 (ongoing)
- L.V. “D” and “S” pole replacement: 2003 to 2019 (ongoing)
- ESQCR Height defect rectification and clearance risk removal: 2014 to 2018
11 KV and L.V Power Cable Laying
- Kingsway shopping centre redevelopment, Newport: 2 x Kilometres of 11KV and L.V. cable installation through buildings at height via MEWPS.
- Friars Walk shopping centre redevelopment, Newport: 1.5 x Kilometres of 11KV cable installation at height via MEWPS – Tandem winching.
- Cardiff bay tower block new builds, Installation of main supply cables, 18 x stories through dry risers using winch techniques.
- Roverway Biomass generation site Cardiff: Installation of 11KV cables, standard install
- Swansea Wind Turbine generator: Installation of 11KV cables and comms, standard install
Stirling Power
Solar Farms; 33KV – excavate and install 3 x Kilometres and 5 x Kilometers, separate sites.
(Numerous other standard cable installations 2004 to 2019 ongoing)
- Commercial Electrical Installation
- Buildings refurbishment and maintenance
- Civil Engineering
Western Power Distribution
- Security Systems Installations in all Grid and Primary Substations – Wales 2007 – 2013
- Electrical Installation in Distribution Substations 2003 – 2013
Woodpole Contracting
Western Power Distribution
- Collection, transportation and installation of H.V. and L.V. Woodpoles: 2003 to 2019 (ongoing)
- L.V. Hand installation/erection specialists
- Difficult access/location and terrain specialists
- 11KV Live line planting
- Steel pole installation
- Pole removal, recovery and reinstatement
Electrical Civil Engineering
Electrical Sub Station Installation
- 132KV Grid and 33KV Primary Substation Heating, Lighting and power installations: 2006 to 2019 (ongoing)
- 11KV Distribution Substation Automation, power and lighting: 2010 to 2015
- Security fixing and anti vandal painting of all earthing systems in Grid Substations: 2007 to 2013
- Security flood lighting of all Grid Substations in South Wales: 2010 to 2013
- Security Alarm system installation of all Grid and Primary Substations in South Wales: 2007 to 2009
- WPD LCNF Losses project, metering of 700 distribution Substations: 2009 to 2010
- WPD Black start project, D.C. Disconnector installation in 200 Grid and Primary Substations 2014 to 2018
- Portable Appliance Testing of WPD Depots and site teams: 2004 to 2019 (ongoing)
- WPD Contracting/private networks, Trenching, cable laying, switchgear installation/removal, Electrical installation: 2014 to 2019 (ongoing)
WPD sub station electrical work:
- Installation of 11KV Sub Station concrete bases (WPD Asset replacement, in excess of 100 sites completed 2010 to 2019 ongoing)
- Installation of CCTV and security lighting bases in sub stations. (2014 to 2016, approx 150 x bases installed)
- Sub Station and depot bund wall installations
- Installation of concrete cable trough systems in Sub Stations
- General building and civils maintenance in Sub Stations in line with current contract
Caerphilly County Borough Council
- Commercial Electrical Installation
Civil Engineering
- McDonalds Contract Goundwork and Civil Engineering 2010 – 2012
-
McDonalds Contract Goundwork and Civil Engineering 2012 – 2016
Caerphilly County Borough Council
- Building Maintenance and Refurbishment
- Civil Engineering