Newconn Project by Service Type

Overhead Line Servicing

Western Power Distribution large logo

  • Overhead Line Service renewals, new supplies and alterations: 2003 to 2019 (ongoing)
  • Arial bundled conductor installation: 2003 to 2019 (ongoing)
  • L.V. “D” and “S” pole replacement: 2003 to 2019 (ongoing)
  • ESQCR Height defect rectification and clearance risk removal: 2014 to 2018

« 1 of 3 »

11 KV and L.V Power Cable Laying

  • Kingsway shopping centre redevelopment, Newport: 2 x Kilometres of 11KV and L.V. cable installation through buildings at height via MEWPS.
  • Friars Walk shopping centre redevelopment, Newport: 1.5 x Kilometres of 11KV cable installation at height via MEWPS – Tandem winching.
  • Cardiff bay tower block new builds, Installation of main supply cables, 18 x stories through dry risers using winch techniques.
  • Roverway Biomass generation site Cardiff: Installation of 11KV cables, standard install
  • Swansea Wind Turbine generator: Installation of 11KV cables and comms, standard install

Stirling Power

Solar Farms; 33KV – excavate and install 3 x Kilometres and 5 x Kilometers, separate sites.

(Numerous other standard cable installations 2004 to 2019 ongoing)

Caerphilly partners logo

  • Commercial Electrical Installation
  • Buildings refurbishment and maintenance
  • Civil Engineering

Western Power Distribution

  • Security Systems Installations in all Grid and Primary Substations – Wales 2007 – 2013
  • Electrical Installation in Distribution Substations 2003 – 2013

« 2 of 2 »

Woodpole Contracting

Western Power Distribution

  • Collection, transportation and installation of H.V. and L.V. Woodpoles: 2003 to 2019 (ongoing)
  • L.V. Hand installation/erection specialists
  • Difficult access/location and terrain specialists
  • 11KV Live line planting
  • Steel pole installation
  • Pole removal, recovery and reinstatement

« 2 of 3 »

Electrical Civil Engineering

Electrical Sub Station Installation

  • 132KV Grid and 33KV Primary Substation Heating, Lighting and power installations: 2006 to 2019 (ongoing)
  • 11KV Distribution Substation Automation, power and lighting: 2010 to 2015
  • Security fixing and anti vandal painting of all earthing systems in Grid Substations: 2007 to 2013
  • Security flood lighting of all Grid Substations in South Wales: 2010 to 2013
  • Security Alarm system installation of all Grid and Primary Substations in South Wales: 2007 to 2009
  • WPD LCNF Losses project, metering of 700 distribution Substations: 2009 to 2010
  • WPD Black start project, D.C. Disconnector installation in 200 Grid and Primary Substations 2014 to 2018
  • Portable Appliance Testing of WPD Depots and site teams: 2004 to 2019 (ongoing)
  • WPD Contracting/private networks, Trenching, cable laying, switchgear installation/removal, Electrical installation: 2014 to 2019 (ongoing)

« 1 of 5 »

WPD sub station electrical work:

  • Installation of 11KV Sub Station concrete bases (WPD Asset replacement, in excess of 100 sites completed 2010 to 2019 ongoing)
  • Installation of CCTV and security lighting bases in sub stations. (2014 to 2016, approx 150 x bases installed)
  • Sub Station and depot bund wall installations
  • Installation of concrete cable trough systems in Sub Stations
  • General building and civils maintenance in Sub Stations in line with current contract

Caerphilly County Borough Council

  • Commercial Electrical Installation

Civil Engineering

Midas partner logo

  • McDonalds Contract Goundwork and Civil Engineering 2010 – 2012

harvey contractors partner logo

  • McDonalds Contract Goundwork and Civil Engineering 2012 – 2016

Caerphilly County Borough Council

  • Building Maintenance and Refurbishment
  • Civil Engineering